Council has several conflicts of interest. Consent Authority, co-proponent, and environmental regulator !!!
Backyard affected,the cleanup is timely but adds more site mud to the creek, doesn't fully address pedestrian safety - Overnight storm on 16 December 2025
Part of the project management response to Storm 4 was to direct mud etc into the creek !
Key takeaways:
fourth time in 44 days construction site stormwater pollutants and debris flowed into creek and partly blocked roads.
At least one Viola place household had polluted stormwater in their backyard
Contractor emptied the polluted retention basin into a stormwater pit and washed other pollutants on the street and footpaths into the creek!
Photos below show the Dianella Court and Viola Place area after flash flooding subsided following ~91 mm of rain in about 5 hours after midnight.
































Videos and photos below show the runoff entering Viola Place then running into and along Dianella Court.


Below: Videos of the mess as discovered by the neighbours. At right- photos.







Below: Cleanup starts while it's still raining - very timely


The cleanup included emptying the on-site sediment retention basin water into a stormwater drain and hosing the dirt at the entrance to Dianella Court into stormwater drains. This added more sediment to the creek.